The club drive property is an undeveloped lot adjacent to the District’s Ascencion Solorsano Middle School. As part of the previous GUSD bond program a new elementary school was proposed on the site. However, the development was canceled due to the changing needs of the District.
While the site is currently vacant, it presents a strategic opportunity to advance the District’s long-term goals.
Immediate Needs (0-5 Years)
-
Design and build Phase 1 of soccer sports complex with multiple natural turf fields, gravel parking and restrooms. This project will be designed to open as fast as possible with Phase 2 being more permanent construction.
Long Term Needs (5-10 Years)
-
Implement Phase 2 of the soccer sports complex with permanent restrooms, snack shack, paving, sports lighting, playground.
Community Engagement Feedback
Mental Health and Social Emotional Needs
If one improvement could be made to help support student mental health and wellness, what would it be?
“I believe the wellness programs are out in a portable. It would be nice to have it more centrally located and in a permanent room rather than a portable.”
Student / Parent
Student / Parent
Student / Parent
Cost Estimate
Site
Club Drive
Immediate Needs (0-5 Years)
Facility Condition Index (FCI)* (5 Years)
Long Term Needs (5-10 Years)
Facility Condition Index (FCI)* (10 Years)
New Construction
Deferred Maintenance
Sport Fields & Playgrounds
Total Site Project Cost (0-5 Years)***
$23,962,525
Total Site Project Cost (5-10 Years)****
$32,067,264
*** Total Project Costs Include:
Base Construction Cost + Contractor Mark Up (30%) + Soft Costs (44%) w. Escalation (5yr)
****Total Project Costs Include:
Base Construction Cost + Contractor Mark Up (30%) + Soft Costs (44%) w. Escalation (10yr)
* FCI Ratings:
| 0-5% | In new or well-maintained condition, with little visual evidence of wear or deficiencies. |
|---|---|
| 5-10% | Subjected to wear but is still in a serviceable and functioning condition. |
| 10-30% | Subjected to hard or long-term wear. Nearing the end of its useful or serviceable life. |
| 30% and Above | Has reached the end of its useful or serviceable life. Renewal is now necessary. |